Tag Archives: cost to restore

Bankruptcy Court Holds That “Economic Waste” Doctrine, as Adopted in Wisconsin, Prevented Owner From Recovering Costs to Repair Defectively Designed Digester and Awards No Damages, Even Though the Digester Was Not Designed to the Applicable Code

WTE-S&S AG Enters., LLC v. GHD, Inc., 2017 Bankr. LEXIS 2343 (Bankr. N. D. Ill. August 18, 2017)  This breach of contract dispute arises out of a contract to design and build a cow-manure digester on a farm in Wisconsin.  … Continue reading

Posted in Economic Waste, Uncategorized | Tagged , , , , , , , , ,