Tag Archives: RWD Consulting

D.C. Federal Court Declines to Enjoin Arbitration Because the Arbitrator Could Issue Any Equitable Relief Required, the Integrity of the Arbitration Was Not Threatened and the Movant’s Projected Economic Loss Did Not Prove Irreparable Harm

TK Servs., Inc. v. RWD Consulting, LLC, 2017 U.S. Dist. Lexis 97239 (D.D.C., June 23, 2017) This litigation arose from a dispute between TK Services, Inc. (“TKS”), as sub-subcontractor, and RWD Consulting, LLC (“RWD”), as prime subcontractor, in connection with … Continue reading

Posted in Arbitration, Uncategorized | Tagged , , ,