Tag Archives: Waiver of Challenges

Contractor Who Failed to Challenge Arbitration Award Within Statutory Three Month Period Cannot Resurrect the Challenge as an “Affirmative Defense” to a Later Action for Confirmation

St. George Fire Prot. Dist. No. 2 v. J. Reed Constructors, Inc. 2018, La. App. LEXIS 262 (February 20, 2018) J. Reed Constructors, Inc. (“J. Reed”) and St. George Fire Protection District No. 2 (“St. George”) entered into two construction … Continue reading

Posted in Arbitration | Tagged , , ,